Friday, 23 March 2012

Processing Timetable

I have put together a timetable, hourly, for next week. I want to focus on getting as much of everything produced next week so that i am going into easter with those briefs, producing wise, under way. That way i have enough time if everything goes wrong to fix it, if i run out of material etc. I want these briefs to be finished by the time i get back, and i need to get the ball properly rolling to get that done. 





(My constant reminder)

No comments:

Post a Comment